12 WTC stairwells at Schiphol Airport

12 WTC stairwells at Schiphol Airport

Jaar

31-12-2022

Cliënt

WTC Schiphol

Diensten

Vloer

Opdrachtgever

In cooperation with Heembouw

Fotograaf

Overzicht

In the 12 stairwells of the WTC office complex at Schiphol, Mirato replaced all floors in 2022. In this project, high planning requirements were set. Indeed, it was not possible to close the stairwells for a long time. That is why, in cooperation with the client, a clear and tight work plan and a logistical route have been agreed. The activities involved dismantling existing coverings, then leveling the subfloors of all steps and landings and then installing a new rubber floor finish (Norament Satura in tiles and preformed staircases).

12 stairwells

1800 steps

750m2 for platforms.

  • Gluing steps with double-sided tape,
  • Completely solvent-free.
  • All old materials offered for recycling by a specialized recycler,